Photo Archives

Back
Start of the rainy season, high flows in St. Paul River Start of the rainy season, high flows in St. Paul River Progress on Control Building - Substation Progress on Control Building - Substation Installation of Winch Bridge for Spillway Gate #1 Installation of Winch Bridge for Spillway Gate #1 Yard of Dawnus for Precasting Yard of Dawnus for Precasting Ongoing works on splash walls for U5 and U6 - Intake Ongoing works on splash walls for U5 and U6 - Intake U1 Lower Bracket and Breaking System for Generator - Power House U1 Lower Bracket and Breaking System for Generator - Power House U1 Lower Guide Bearing Pads U1 Lower Guide Bearing Pads Generator Excitation Assembly - Unit 1 Generator Excitation Assembly - Unit 1 Rotor Rim Stacking - Unit 3 Rotor Rim Stacking - Unit 3 Raising of cofferdam to protect Intake Raising of cofferdam to protect Intake Placement of cable ducts on crest - main dam south Placement of cable ducts on crest - main dam south Removal of stop logs and opening of spillway - Gate 9 Intake Removal of stop logs and opening of spillway - Gate 9 Intake Installation of intake roller - Gate 3 Intake Installation of intake roller - Gate 3 Intake Progress of erectio works on the substation Progress of erectio works on the substation Assembly of transmission tower right next to substation Assembly of transmission tower right next to substation Down stream view of main dam close-up Down stream view of main dam close-up Down stream view of main dam close-up Down stream view of main dam close-up Stringing of 132KV Transmission Line along Caldwell Road Stringing of 132KV Transmission Line along Caldwell Road Forebay Dam 1 Looking West Forebay Dam 1 Looking West Power House Looking Upstream Power House Looking Upstream Campsite Looking East Campsite Looking East Downstream Face of Spillway Gates Downstream Face of Spillway Gates Downstream Face of Gate #10 Downstream Face of Gate #10 New Forebay Dam 1 Placement New Forebay Dam 1 Placement Upstream Face of Main Dam North Upstream Face of Main Dam North 40ft Truck on Causeway 40ft Truck on Causeway South & West Faces of Power House South & West Faces of Power House Newly Painted Guide Vanes around Wicket Gates and Runner of Turbine #2 Newly Painted Guide Vanes around Wicket Gates and Runner of Turbine #2 Connection of Upper and Lower Turbine Shaft Unit 1 Connection of Upper and Lower Turbine Shaft Unit 1 Lifiting in of Generator Shaft Unit 1 Lifiting in of Generator Shaft Unit 1
« 1 of 2 »